Drains in Kovalam basin to get infiltration wells

As part of its interim report for the 301 km-long integrated stormwater drain (ISWD) network to be built in the Kovalam basin along the Pallikaranai marshland and South Buckingham Canal (M1 and M2), Greater Chennai Corporation said it will provide infiltration wells in the drain at every 30 M and also integrate nearly 16 water bodies in the nearby areas for rainwater harvesting.

To read more..